PROGRESS CONTINUES ON THE NEW BUILDING:
Steel is up for the entrance:![june2008-026copy.jpg](https://herewego.kccwired.com/wp-content/uploads/2008/06/june2008-026copy.jpg)
Laying the tubing for the heated floors:![copy-of-june2008-025.jpg](https://herewego.kccwired.com/wp-content/uploads/2008/06/copy-of-june2008-025.jpg)
![copy-of-june2008-024.jpg](https://herewego.kccwired.com/wp-content/uploads/2008/06/copy-of-june2008-024.jpg)
This entry was posted on Wednesday, June 4th, 2008 at 09:28 and is filed under Uncategorized. You can follow any responses to this entry through the RSS 2.0 feed.
Both comments and pings are currently closed.